Home / Archive by category "Conservation Case Studies" (Page 2)

Conservation Case Studies

Franklin Templeton Building – St. Petersburg, FL

Franklin Templeton Building - St. Petersburg, FL This Class A office building uses four 500 ton Baltimore Air Coil cooling tower cells for a total of 2000 tons of cooling. The building's previous cooling tower water treatment program maintained 3 cycles of concentration, or 33% water waste.The Terlyn Conservation Program slowly removes existing scale while online. When first installed, the Terlyn Program cleaned a massive amount of existing scale from the system that settled loosely i...
Read More

Central Station – St. Petersburg, FL

 Central Station Building - St. Petersburg, FLCentral Station is an office building as well as a large downtown parking garage.Over 7 years of operation, this property used both corrosion coupon and eddy current testing to verify that corrosion rates were maintained in the excellent ranges.In the seven years since the Terlyn System was installed, the cooling tower at The Central Station Building has conserved 6,484,701 gallons of water. This dramatic reduction in water consump...
Read More

Pinellas County Utilities Headquarters – Clearwater, FL

Pinellas County Utilities Headquarters - Clearwater, FLThis small office building is the headquarters for The Pinellas County Water Utility located in downtown Clearwater, Florida.Over these 12 years of operation, this property decided to use eddy current testing and corrosion coupons to test for corrosion in the system. Both corrosion coupon and eddy current test results were excellent.The savings graph below represents the total cooling tower water usage previous to installin...
Read More

Denver Federal Center Building 67 – Lakewood, Colorado

Denver Federal Center Building 67 - Lakewood, CO Building 67 is a 372,000 square foot, 14 floor high rise concrete building located in the Denver Federal Center. the Denver Federal Center is a collection of 44 federal buildings totaling 4 million square feet of rentable space.The savings graph shows the monthly water usage of the cooling tower on the previous water treatment program versus the Terlyn Conservation Program. Due to the high quality potable water in from Denver Water, th...
Read More

Denver Water Headquarters – Denver, Colorado

 Denver Water Utility Headquarters - Denver, CODenver Water installed the Terlyn Cooling Tower Water & Energy Conservation Program on the 700 ton Marley cooling tower system on their building’s headquarters. The Terlyn Conservation Program’s success produced an annual water conservation of approximately 250,000 gallons per year. Their website states that commercial, industrial and institutional customers can make similar water-saving changes to their cooling towers and earn an in...
Read More
Top